Solar system installation
On-grid or hybrid solar, sized after a site and load survey.
What’s included
- Load and roof survey
- System sizing and payback estimate
- Net-metering paperwork guidance
What’s not
- Utility approval fees
- Roof strengthening
Every professional on Abbaad has had their trade licence checked, and the money for a job is held for three days after it is finished. If something is wrong, say so in that window and we hold the payment while we sort it out.